Description
This is a complete package for metal and ceramic 3D printing.
It consists of three major parts:
1. ZYYX Pro II MC™ 3D printer
2. Debinding Unit
3. A tubular furnace for sintering ceramics in ambient air, and steel parts under inert atmosphere.
Sintering steel parts under inert atmosphere means in a gas, it can be either Argon mix with 2.5% H2 or 100% Nitrogen (N2).
Characteristics
See the respective part for details:
ZYYX Pro II MC™ – 3D Printer Kit for Composites, Metals, and Ceramics
ZX160 Debinding Unit
ZX161 Tubular Sintering Furnace for Ceramics and Metals
You can read about the process in detail in section Metal & Ceramic Solutions.
Material Compatibility
Ceramics: Porcelain, Alumina, White/Black Zirconia, Silicon Carbide partially (not sintering)
Metals: H13 tool steel, 316L Stainless steel
Plastics & Composites: All ZYYX filaments
Delivery time of 3D printer is 2-3 weeks.
The furnace is a non-stock product. Delivery time for that is 4-6 weeks
Prepayment 50 %.
Note: For metals Argon/H2 gas mix or N2 gas is needed. Gas bottle, pressure reducer, and inlet hose are not included with the package.)